MACL Power Upgrading
This project is successfully completed by bronze in year 2019-2020 with scope of work as supply, Fabrication, NDT, Pre Assembly of stack support only was carried out successfully in bronze yard located in DIP, Dubai.
Material grade was SS 316L for SS Duct, S-275 JR, A-36, A-106 gr. B for pipe with 2 coat epoxy painting of tanks, stack support, duct support and these brackets are successfully installed by client at site.
Location: Male, Maldives
Client: Maldives Airports Company Limited
Contractor: Sterling and Wilson powergen Pvt. Ltd. (Associates of: Shapoorji Pallonji & Co. Pvt. Ltd)
Year: 2019-2020
Project: MACL Power Upgrading project 4X4 MW at Via